Translations:Risikobewertung/65/en
Aus HITGuard User Guide
Weitere Optionen
Ability to control:
- This is the evaluation of the quality of the set of treatment measures and controls that has already been implemented.
- The abilities to control available for selection can be configured in the Risk policy.