Translations:Kontrolldefinitionen/47/en
Aus HITGuard User Guide
Weitere Optionen
A control can be in various states:
- Pending: The performance of the control by the implementer has been triggered but not yet completed.
- Suspended: The control does not currently need to be performed.
- Needs approval: The control has been forwarded to the examiner(s) by the implementer.
- Finished: The control was accepted during approval.
- Failed: The control was not accepted during approval or the deadline was exceeded.
- Irrelevant: Controls must not be deleted. If they are to not be considered in KPIs or reports, they can instead be marked as irrelevant.