Translations:Berichte für das Risikomanagement/155/en
Aus HITGuard User Guide
Weitere Optionen
Report options
- Analysis period
- This option controls which analysis period the measures/controls included in the report come from.
- Measures
- It is possible to configure in which status the measures must be in order to appear in the report.
- Controls
- It is possible to configure in which status the controls must be in order to appear in the report.