Menü aufrufen
Toggle preferences menu
Persönliches Menü aufrufen
Nicht angemeldet
Ihre IP-Adresse wird öffentlich sichtbar sein, wenn Sie Änderungen vornehmen.

Progress report

On this page you can create, view, and download reports for measures within a specific analysis period for selected organizational units.

The reports offer an evaluation of the measures and the project progress. The evaluation of the measures deals with their criticality and recommends an implementation timeframe on the basis of that. The evaluation of the project progress shows, using traffic light colors, the evaluation of the progress of individual measures and the project as a whole. Completed measures are displayed as crossed out text in this report, suspended ones in italics.

Reports already created are listed to the left. A click on such an entry shows the report's revision information and it can be generated anew, if any modification is necessary. Clicking the blue name in the list opens an online preview of the report. If the name is blac, the report was prepared but not yet generated. Clicking the download symbol downloads a generated report.

Inhaltsverzeichnis