Translations:FAQ/2/en
Aus HITGuard User Guide
Weitere Optionen
My Tasks
Why does an orange number appear next to my controls, actions, etc. under My Tasks?
- This can have several meanings:
- These controls are to be performed by you.
- These controls are to be checked by you. In this case, an additional indicator is also displayed.
- These measures are overdue, that is, the measures have exceeded their planned date. This case is also indicated by an additional flag.
For controls, the columns "To be performed by me" and "To be checked by me" can be displayed as an additional option.