Translations:Aktuelle Maßnahmen/5/en
Aus HITGuard User Guide
Weitere Optionen
Meaning of the symbols:
- Check mark: The measure has been completed.
- Plus: The measure was added in the current analysis period.
- Circle: The measure was added in an older analysis period.
Meaning of the colors:
Color | Analysis period-based traffic light control | Deadline-based traffic light control |
---|---|---|
Green | The measure is within the time limit. | Time from measure creation to X days before/after deadline. |
Orange | The measure is one analysis period past the deadline. | Time from the end of green to X days before/after deadline. |
Red | The measure is several analysis periods past the deadline. | Time after the end of orange |
Gray | Independently of the traffic light controls: The measure is in the state Submitted/Suspended/Planned/Canceled/Rejected. | |
Color of completed measures | The color of completed measures reflects if it was completed in time (green) or late (orange or red). With deadline-based traffic light control, this color can be changed by modifying the completed on-date prior to the measure becoming read-only (creation of successor analysis period). With analysis period-based traffic light control, the color does not change. |