Menü aufrufen
Toggle preferences menu
Persönliches Menü aufrufen
Nicht angemeldet
Ihre IP-Adresse wird öffentlich sichtbar sein, wenn Sie Änderungen vornehmen.
Version vom 26. November 2024, 08:40 Uhr von Isan (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)

Meaning of the symbols:

  • Check mark: The measure has been completed.
  • Plus: The measure was added in the current analysis period.
  • Circle: The measure was added in an older analysis period.

Meaning of the colors:

Color Analysis period-based traffic light control Deadline-based traffic light control
Green The measure is within the time limit. Time from measure creation to X days before/after deadline.
Orange The measure is one analysis period past the deadline. Time from the end of green to X days before/after deadline.
Red The measure is several analysis periods past the deadline. Time after the end of orange
Gray Independently of the traffic light controls: The measure is in the state Submitted/Suspended/Planned/Canceled/Rejected.
Color of completed measures The color of completed measures reflects if it was completed in time (green) or late (orange or red). With deadline-based traffic light control, this color can be changed by modifying the completed on-date prior to the measure becoming read-only (creation of successor analysis period). With analysis period-based traffic light control, the color does not change.