Translations:Aktuelle Maßnahmen/5/en
Aus HITGuard User Guide
Weitere Optionen
Meaning of the symbols:
- Check mark: The measure has been completed.
- Plus: The measure was added in the current analysis period.
- Circle: The measure was added in an older analysis period.
Meaning of the colors:
Color | Analysis period-based traffic light control | Deadline-based traffic light control |
---|---|---|
Green | The measure is within the time limit. | Time from measure creation to X days before/after deadline. |
Orange | The measure is one analysis period past the deadline. | Time from the end of green to X days before/after deadline. |
Red | The measure is several analysis periods past the deadline. | Time after the end of orange |
Gray | Independently of the traffic light controls: The measure is in the state Suspended/Planned/Canceled. |