Translations:Managementsysteme/10/en
Aus HITGuard User Guide
Weitere Optionen
The interval schema is used to define whether analysis periods should follow a predefined rhythm.
Analysis periods can be:
- Manually set: Here, the time restriction is defined manually with a from-to date. This is set individually for each period.
- Start date plus interval: Here, a year is divided into three analysis periods. For example, starting with 2/1 to 5/31/2021; 6/1 to 9/30/2021 and 10/1 to 1/31/2022.