Translations:Managementsysteme/10/en
Aus HITGuard User Guide
Weitere Optionen
- Define Interval Schema:
- The interval scheme determines whether a analysis period shall follow a specified rhythm.
Analysis periods can be:- created manually: manuelly define the time restriction with from-to date during creation for every creation individually.
- Startdate plus intervall: e.g. dividing the year into 3 analysis periods starting with 1.2 => 1.2.-31.5; 1.6. - 30.09; 1.10.-31.1
- The interval scheme determines whether a analysis period shall follow a specified rhythm.