Translations:Risikobewertung/38/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
This tab lists all measures and controls that have been assigned to the | This tab lists all measures and controls that have been assigned to the risk and therefore contribute to the risk treatment. Depending on their state they are displayed either in the top or the bottom table, more on this below. The measures and controls either come from the assignment of a gap, are selected from the available list (link button) or are created here specifically for the risk (plus button). |
Version vom 15. Juni 2023, 11:54 Uhr
This tab lists all measures and controls that have been assigned to the risk and therefore contribute to the risk treatment. Depending on their state they are displayed either in the top or the bottom table, more on this below. The measures and controls either come from the assignment of a gap, are selected from the available list (link button) or are created here specifically for the risk (plus button).