Translations:Risikomanagement Dashboard/50/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Faha (Diskussion | Beiträge) Die Seite wurde neu angelegt: „The time span under the risk matrix can be used to track how hazard situations have developed over a period of time. All you have to do is click on one of the…“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| Zeile 1: | Zeile 1: | ||
The time span under the risk matrix can be used to track how | The time span under the risk matrix can be used to track how risks have developed over a period of time. All you have to do is click on one of the points in the time span. The time span can be adjusted using the arrows on the left and right. | ||
Aktuelle Version vom 15. Juni 2023, 11:40 Uhr
The time span under the risk matrix can be used to track how risks have developed over a period of time. All you have to do is click on one of the points in the time span. The time span can be adjusted using the arrows on the left and right.