Translations:Globale Einstellungen/23/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Faha (Diskussion | Beiträge) Die Seite wurde neu angelegt: „*Risk reduction: ::If a measure was implemented in parts and thus a reduction of the assigned risk took place,<br>so the indicator "risk reduction" can be set…“ |
Faha (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| Zeile 1: | Zeile 1: | ||
*Risk reduction: | *Risk reduction: | ||
::If a measure was implemented in parts and thus a reduction of the assigned risk took place,<br>so the indicator "risk reduction" can be set for the measure. | ::If a measure was implemented in parts and thus a reduction of the assigned risk took place,<br>so the indicator "risk reduction" can be set for the measure. The indicator is automatically removed again in the next analysis period. | ||
Version vom 15. November 2021, 07:41 Uhr
- Risk reduction:
- If a measure was implemented in parts and thus a reduction of the assigned risk took place,
so the indicator "risk reduction" can be set for the measure. The indicator is automatically removed again in the next analysis period.
- If a measure was implemented in parts and thus a reduction of the assigned risk took place,