Translations:Aktuelle Maßnahmen/5/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Sala (Diskussion | Beiträge) Die Seite wurde neu angelegt: „<u>Meaning of the symbols:</u> * Check mark: The measure has been completed. * Plus: The measure was added in the current analysis period. * Circle: The measu…“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
Zeile 5: | Zeile 5: | ||
<u>Meaning of the colors:</u> | <u>Meaning of the colors:</u> | ||
* Green: The measure is within the time limit. | * Green: The measure is within the time limit. | ||
* Orange: The measure is one analysis period | * Orange: The measure is one analysis period past the deadline. | ||
* Red: The measure is several analysis periods | * Red: The measure is several analysis periods past the deadline. | ||
* Grey: The measure is in the state Suspended/Planned/Canceled. |
Version vom 17. Oktober 2022, 06:24 Uhr
Meaning of the symbols:
- Check mark: The measure has been completed.
- Plus: The measure was added in the current analysis period.
- Circle: The measure was added in an older analysis period.
Meaning of the colors:
- Green: The measure is within the time limit.
- Orange: The measure is one analysis period past the deadline.
- Red: The measure is several analysis periods past the deadline.
- Grey: The measure is in the state Suspended/Planned/Canceled.