Translations:Berichte für das Risikomanagement/200/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Die Seite wurde neu angelegt: „The exact structure and content of the report can be configured with the report options.“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| Zeile 1: | Zeile 1: | ||
The exact structure and content of the report can be configured with the report options. | The exact structure and content of the report can be configured with the report options. | ||
*<u>Gross risk</u>: Adds the probability of occurrence and the extent of damage of the original gross risk. | |||
*<u>Treatment of the gross risk</u>: Adds the measures and control intended for the treatment of the gross risk. | |||
*<u>Ability to Control</u>: Adds the ability to control of the treating measures and controls to the information of the gross risk. | |||
*<u>Treatment of the current risk</u>: Adds the measures and control intended for the treatment of the gross risk. | |||
<u>Net risk with best/most likely/worst case</u>: Adds the probability of occurrence and the extent of damage of the selected net risk scenarios. At least one scenario needs to be selected for this. | |||
<u>Risk matrices</u>: Adds the matrix as an image to the textual information of the gross and net risks. | |||
The remaining report options control the amount of details for the report's content. | |||
Version vom 6. März 2023, 07:45 Uhr
The exact structure and content of the report can be configured with the report options.
- Gross risk: Adds the probability of occurrence and the extent of damage of the original gross risk.
- Treatment of the gross risk: Adds the measures and control intended for the treatment of the gross risk.
- Ability to Control: Adds the ability to control of the treating measures and controls to the information of the gross risk.
- Treatment of the current risk: Adds the measures and control intended for the treatment of the gross risk.
Net risk with best/most likely/worst case: Adds the probability of occurrence and the extent of damage of the selected net risk scenarios. At least one scenario needs to be selected for this. Risk matrices: Adds the matrix as an image to the textual information of the gross and net risks. The remaining report options control the amount of details for the report's content.