Translations:Aktuelle Maßnahmen/5/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
Zeile 4: | Zeile 4: | ||
* Circle: The measure was added in an older analysis period. | * Circle: The measure was added in an older analysis period. | ||
<u>Meaning of the colors:</u> | <u>Meaning of the colors:</u> | ||
{| class="wikitable" | |||
!Color | |||
!Analysis period-based traffic light control | |||
!Deadline-based traffic light control | |||
|- | |||
!Green | |||
|The measure is within the time limit. | |||
|Time from measure creation to X days before/after deadline. | |||
|- | |||
!Orange | |||
|The measure is one analysis period past the deadline. | |||
|Time from the end of green to X days before/after deadline. | |||
|- | |||
!Red | |||
|The measure is several analysis periods past the deadline. | |||
|Time after the end of orange | |||
|- | |||
!Gray | |||
|colspan="2"|''Independently of the traffic light controls:'' The measure is in the state Suspended/Planned/Canceled. | |||
|- | |||
|} |
Version vom 13. Juni 2023, 05:51 Uhr
Meaning of the symbols:
- Check mark: The measure has been completed.
- Plus: The measure was added in the current analysis period.
- Circle: The measure was added in an older analysis period.
Meaning of the colors:
Color | Analysis period-based traffic light control | Deadline-based traffic light control |
---|---|---|
Green | The measure is within the time limit. | Time from measure creation to X days before/after deadline. |
Orange | The measure is one analysis period past the deadline. | Time from the end of green to X days before/after deadline. |
Red | The measure is several analysis periods past the deadline. | Time after the end of orange |
Gray | Independently of the traffic light controls: The measure is in the state Suspended/Planned/Canceled. |