Translations:Risikobewertung/64/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Die Seite wurde neu angelegt: „If a new measure or control is implemented and thus inserted into this table, it is recommended to revaluate the hazard situation. The hazard situation and the…“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
If a new measure or control is implemented and thus inserted into this table, it is recommended to revaluate the hazard situation. The hazard situation and the triggering measure or control are then marked with "Revaluation recommended". The revaluation shows whether the current risk has changed with the impact of the implementation. In the case of measures, this is only triggered if the " | If a new measure or control is implemented and thus inserted into this table, it is recommended to revaluate the hazard situation. The hazard situation and the triggering measure or control are then marked with "Revaluation recommended". The revaluation shows whether the current risk has changed with the impact of the implementation. In the case of measures, this is only triggered if the "Completed" date was set and doesn't fall on the same day of the last relevant revaluation (a relevant revaluation in this context is a change entry in the temporal development log where either extent of damage or probability of occurrence were changed). |
Version vom 2. März 2023, 07:00 Uhr
If a new measure or control is implemented and thus inserted into this table, it is recommended to revaluate the hazard situation. The hazard situation and the triggering measure or control are then marked with "Revaluation recommended". The revaluation shows whether the current risk has changed with the impact of the implementation. In the case of measures, this is only triggered if the "Completed" date was set and doesn't fall on the same day of the last relevant revaluation (a relevant revaluation in this context is a change entry in the temporal development log where either extent of damage or probability of occurrence were changed).