Translations:Berichte für das Risikomanagement/51/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Sala (Diskussion | Beiträge) Die Seite wurde neu angelegt: „To generate a deviation report, navigate to "Risk Management → Reports → Measures and Controls". There you will find several options to generate a measures…“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| Zeile 1: | Zeile 1: | ||
To generate a | To generate a gap report, navigate to "Risk Management → Reports → Measures and Controls". There, you will find several options to generate a measures and controls report: | ||
# Risks | # Risks | ||
#:* You can generate a measures and controls report from a single risk. | #:* You can generate a measures and controls report from a single risk. | ||
Aktuelle Version vom 12. Mai 2022, 08:39 Uhr
To generate a gap report, navigate to "Risk Management → Reports → Measures and Controls". There, you will find several options to generate a measures and controls report:
- Risks
- You can generate a measures and controls report from a single risk.
- However, you can only generate risk reports in management systems where you are assigned.
- You have the option to include or exclude measures or controls through the reporting options.
- Standards/Norm
- You can generate a measure, control or summary management report on a standard or norm. These reports display all measures and controls - mapped to a standard.