Translations:Risikobewertung/38/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
This tab lists all measures and controls that have been assigned to the risk/opportunity and therefore contribute to the treatment. Depending on their state they are displayed either in the top or the bottom table, more on this below. The measures and controls either come from the assignment of a gap, are selected from the available list (link button) or are created here specifically for the risk/opportunity (plus button). | This tab lists all measures and controls that have been assigned to the risk/opportunity and therefore contribute to the treatment. Depending on their state they are displayed either in the top or the bottom table, more on this below. The measures and controls either come from the assignment of a gap, are selected from the available list (link button) or are created here specifically for the risk/opportunity (plus button). If a measure is created here, the responsible is preset with the responsible of the risk, but can be changed. |
Aktuelle Version vom 22. August 2025, 05:25 Uhr
This tab lists all measures and controls that have been assigned to the risk/opportunity and therefore contribute to the treatment. Depending on their state they are displayed either in the top or the bottom table, more on this below. The measures and controls either come from the assignment of a gap, are selected from the available list (link button) or are created here specifically for the risk/opportunity (plus button). If a measure is created here, the responsible is preset with the responsible of the risk, but can be changed.