Translations:Berichte für Kontrollen/37/en: Unterschied zwischen den Versionen
Aus HITGuard User Guide
Weitere Optionen
Isan (Diskussion | Beiträge) Die Seite wurde neu angelegt: „===Control report for standard/norm=== This report lists the linked control definitions for a selected standard/norm. The statistic and execution protocol, if selected, include all finished, failed, and possibly irrelevant controls. {| class="wikitable" ! colspan="2" | <b>Report options</b> |- !Selection of the analysis period |This option determines which analysis period the report elements come from. |- !Table of contents |This option determines whether…“ |
Isan (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| (Eine dazwischenliegende Version desselben Benutzers wird nicht angezeigt) | |||
| Zeile 5: | Zeile 5: | ||
|- | |- | ||
!Selection of the analysis period | !Selection of the analysis period | ||
|This option determines which analysis period the report elements come from. | |This option determines which analysis period the report elements come from. Meaning, which control executions appear in the report depends on this selection. Control definitions are not affected by this restriction. | ||
|- | |||
!Selection of the time period (from-to) | |||
|This option determines from which time period the control executions are included in the report (from-date, to-date). It offers an additional restriction to the analysis period. | |||
|- | |- | ||
!Table of contents | !Table of contents | ||
| Zeile 29: | Zeile 32: | ||
|- | |- | ||
|} | |} | ||
[[ | Control report to standard/norm example: [[Media:Kontrollbericht_zu_StaNo_Beispiel.pdf|Control report to standard/norm]]<p> | ||
Aktuelle Version vom 19. Januar 2026, 10:25 Uhr
Control report for standard/norm
This report lists the linked control definitions for a selected standard/norm. The statistic and execution protocol, if selected, include all finished, failed, and possibly irrelevant controls.
| Report options | |
|---|---|
| Selection of the analysis period | This option determines which analysis period the report elements come from. Meaning, which control executions appear in the report depends on this selection. Control definitions are not affected by this restriction. |
| Selection of the time period (from-to) | This option determines from which time period the control executions are included in the report (from-date, to-date). It offers an additional restriction to the analysis period. |
| Table of contents | This option determines whether a table of contents is included in the report. |
| Statistic | Adds an execution statistic for each control definition to the report. |
| Execution protocol | Adds the execution protocol for each control definition to the report. |
| Irrelevant control executions | Determines whether controls in the state irrelevant are considered in the report. |
| Remarks | Determines whether the control definition remarks are included in the report. |
| Include not applicable chapters in the statistics | Determines whether chapters marked as not applicable in the management system are considered in the report. |
| Appendix with explanations | Adds an appendix with different explanatory texts. |
Control report to standard/norm example: Control report to standard/norm